Project Type:

Distribution centers

Category Type:

Industrial

Total Size SQM

4700m

Overview

We proudly introduce our newly completed distribution center—an advanced logistics hub constructed entirely from heavy steel, designed to meet the demands of modern supply chains with unmatched durability, flexibility, and efficiency.

This facility is engineered for high-volume operations, with wide clear-span interiors, high-load capacity floors, and integrated systems to support seamless inventory flow. The use of heavy steel ensures long-term structural performance, rapid build time, and the ability to scale with your business.

Project Property
4700m
Heavy Steel
Steel Frame
Distribution centers
Other Projects

Discover More Inspiring Spaces

View All
View All

School Model Number-856704

A Strong Foundation for Future Generations: A New School Built with Heavy Steel

Location:
Worldwide
Type of Work:
Institutional Design
Completion Date:
October 2024
1700m
Heavy Steel
Steel Frame
School
School Model Number-856704

Apple Cabin E70

Apple Cabin E70

Location:
Worldwide
Type of Work:
Apple Cabin
Completion Date:
May 2024
10
Light Gauge Steel LGS
Prefab
Apple Cabin
Apple Cabin E70