Project Type:

Distribution centers

Category Type:

Industrial

Total Size SQM

4700m

Overview

We proudly introduce our newly completed distribution center—an advanced logistics hub constructed entirely from heavy steel, designed to meet the demands of modern supply chains with unmatched durability, flexibility, and efficiency.

This facility is engineered for high-volume operations, with wide clear-span interiors, high-load capacity floors, and integrated systems to support seamless inventory flow. The use of heavy steel ensures long-term structural performance, rapid build time, and the ability to scale with your business.

Project Property
4700m
Heavy Steel
Steel Frame
Distribution centers
Other Projects

Discover More Inspiring Spaces

View All
View All

Aircraft hangar in South Africa

South Africa Aircraft hanger

Location:
Cape Town, South Africa
Type of Work:
Industrial Design
Completion Date:
February 2025
600m
Steel
Heavy Steel Structure
Aircraft Hanger
Aircraft hangar in South Africa

Distribution Centers Model Number 6957803

Built for Speed, Strength, and Scale: A New Heavy Steel Distribution Center

Location:
Worldwide
Type of Work:
Industrial
Completion Date:
October 2024
4700m
Heavy Steel
Steel Frame
Distribution centers
Distribution Centers Model Number 6957803