Project Type:

Parking Building

Category Type:

Commercial Design

Total Size SQM

8000m

Overview

We are proud to introduce a next-generation parking facility built entirely from heavy steel—designed for strength, speed, and seamless mobility in high-demand urban and commercial environments.

This multi-level structure combines durability with smart design, offering maximized vehicle capacity, optimized traffic flow, and rapid construction—all thanks to the advantages of heavy steel. Whether for retail centers, airports, hospitals, or business districts, this parking building is built to perform.

Project Property
8000m
Heavy Steel
Steel Frame
Parking Building
Other Projects

Discover More Inspiring Spaces

View All
View All

Apple Cabin P5

Apple Cabin - P5

Location:
Worldwide
Type of Work:
Capsule House
Completion Date:
May 2024
31 ㎡
Light Gauge Steel LGS
Prefab Construction
Apple Cabin
Apple Cabin P5

School Model Number-856702

A Strong Foundation for Future Generations: A New School Built with Heavy Steel

Location:
Worldwide
Type of Work:
Institutional Design
Completion Date:
October 2024
1700m
Heavy Steel
Steel Frame
School
School Model Number-856702