Project Type:

Parking Building

Category Type:

Commercial Design

Total Size SQM

8000m

Overview

We are proud to introduce a next-generation parking facility built entirely from heavy steel—designed for strength, speed, and seamless mobility in high-demand urban and commercial environments.

This multi-level structure combines durability with smart design, offering maximized vehicle capacity, optimized traffic flow, and rapid construction—all thanks to the advantages of heavy steel. Whether for retail centers, airports, hospitals, or business districts, this parking building is built to perform.

Project Property
8000m
Heavy Steel
Steel Frame
Parking Building
Other Projects

Discover More Inspiring Spaces

View All
View All

Factory Model Number 49579

Industrial Strength, Built for Performance: A New Factory Constructed from Heavy Steel

Location:
Worldwide
Type of Work:
Industrial
Completion Date:
October 2024
10000m
Heavy Steel
Steel Frame
Factory
Factory Model Number 49579

Hospital Model Number 855802

Introducing the Future of Healthcare Infrastructure

Location:
Worldwide
Type of Work:
Institutional Design
Completion Date:
October 2024
1500m
Heavy Stee
Steel Frame
Hospital
Hospital Model Number 855802