Project Type:

Parking Building

Category Type:

Commercial Design

Total Size SQM

8000m

Overview

We are proud to introduce a next-generation parking facility built entirely from heavy steel—designed for strength, speed, and seamless mobility in high-demand urban and commercial environments.

This multi-level structure combines durability with smart design, offering maximized vehicle capacity, optimized traffic flow, and rapid construction—all thanks to the advantages of heavy steel. Whether for retail centers, airports, hospitals, or business districts, this parking building is built to perform.

Project Property
8000m
Heavy Steel
Steel Frame
Parking Building
Other Projects

Discover More Inspiring Spaces

View All
View All

Capsule House G9

G9 SPACE CAPSULE

Location:
Worldwide
Type of Work:
Capsule House
Completion Date:
December 2024
30㎡
Steel
Light gauge steel
Space Capsule
Capsule House G9

Greenhouse Model Number 958705

Growing Strong: A New Heavy Steel Greenhouse for Year-Round Production

Location:
Woldwide
Type of Work:
Agricultural
Completion Date:
December 2024
15000m
Heavy Steel
Steel Frame
Greenhouse
Greenhouse Model Number 958705